Built Around the Reality of the Job.

Project: TRYP Hotel
Location: Palmerston North
Products: Mayer 316L Stainless Steel, Mayer PEX-a Slide
Application: Potable domestic hot and cold water systems
Installer: Semtex Plumbing
Developer: Safari Group

Hotel projects ask a lot of the space behind the walls. At TRYP Hotel in Palmerston North, a tight footprint and complex service layout meant the water system had to be planned around the building - not forced into it.

The answer was not one product. It was the right combination of systems.

The Challenge

Primary reticulation, room connections and custom distribution all needed to fit within limited ceiling and riser space. The installation had to remain practical on site while delivering reliable hot and cold water services for a high-use hotel environment.

Built Around the Reality of the Job.

Project: TRYP Hotel
Location: Palmerston North
Products: Mayer 316L Stainless Steel, Mayer PEX-a Slide
Application: Potable domestic hot and cold water systems
Installer: Semtex Plumbing
Developer: Safari Group

Hotel projects ask a lot of the space behind the walls. At TRYP Hotel in Palmerston North, a tight footprint and complex service layout meant the water system had to be planned around the building - not forced into it.

The answer was not one product. It was the right combination of systems.

The Challenge

Primary reticulation, room connections and custom distribution all needed to fit within limited ceiling and riser space. The installation had to remain practical on site while delivering reliable hot and cold water services for a high-use hotel environment.

The Outcome

  • Reliable domestic hot and cold water services throughout the hotel

  • Efficient use of limited ceiling and riser space

  • A practical combination of stainless steel reticulation and flexible tail-outs

  • Custom manifolds designed specifically around the project layout

The project shows what fit-for-purpose really means: choosing and supporting the right system for each part of the job.

The Outcome

  • Reliable domestic hot and cold water services throughout the hotel

  • Efficient use of limited ceiling and riser space

  • A practical combination of stainless steel reticulation and flexible tail-outs

  • Custom manifolds designed specifically around the project layout

The project shows what fit-for-purpose really means: choosing and supporting the right system for each part of the job.

“Customer testimonials to reinforce our partnerships, relationships and vibes”.

Dean Martin, Company Name

Want to get in touch and discuss your options? Contact us today

Product updates, insights and practical know-how straight to your inbox.

By signing up, you agree to our privacy policy.

Product updates, insights and practical know-how straight to your inbox.

By signing up, you agree to our privacy policy.