Project: Geothermal Pumped Sewer Main
System: Aquatherm Blue PP-R
Scope: Large-diameter, trenchless installation
Partners: Hynds Pipe Systems Limited, Fulton Hogan

A geothermal pumped sewer main is not a standard installation - and it is not a job where there is room for guesswork.

From specification through to commissioning, the project demanded a piping system that could handle pressure, temperature variation and long-term operation. It also needed a supply partner willing to stay involved beyond delivery.

That’s where USCO came in.

The Challenge

The project required a large-diameter solution suited to a geothermal environment, with installation efficiency front of mind. The trenchless installation added another layer of complexity, making material selection, joint integrity and installer confidence critical. Time on site also needed to be reduced without compromising the quality of the installation.

More Than Pipe. Backed All the Way.

Project: Geothermal Pumped Sewer Main
System: Aquatherm Blue PP-R
Scope: Large-diameter, trenchless installation
Partners: Hynds Pipe Systems Limited, Fulton Hogan

A geothermal pumped sewer main is not a standard installation - and it is not a job where there is room for guesswork.

From specification through to commissioning, the project demanded a piping system that could handle pressure, temperature variation and long-term operation. It also needed a supply partner willing to stay involved beyond delivery.

That’s where USCO came in.

The Challenge

The project required a large-diameter solution suited to a geothermal environment, with installation efficiency front of mind. The trenchless installation added another layer of complexity, making material selection, joint integrity and installer confidence critical. Time on site also needed to be reduced without compromising the quality of the installation.

The Outcome

  • A corrosion-free piping system suited to the geothermal environment

  • Faster installation through longer pipe lengths and fewer joints.

  • Greater installer confidence through practical training and support

  • Reduced on-site risk through correct specification.

  • A durable, corrosion-free system built for long-term performance.

This project is a strong example of why enquiries for large-diameter Aquatherm Blue are growing – particularly where trenchless installation, durability, and long-term reliability are critical.

It is a strong example of what USCO brings to complex projects: the right system, practical knowledge and support that stays with the job.

The Outcome

  • A corrosion-free piping system suited to the geothermal environment

  • Faster installation through longer pipe lengths and fewer joints.

  • Greater installer confidence through practical training and support

  • Reduced on-site risk through correct specification.

  • A durable, corrosion-free system built for long-term performance.

This project is a strong example of why enquiries for large-diameter Aquatherm Blue are growing – particularly where trenchless installation, durability, and long-term reliability are critical.

It is a strong example of what USCO brings to complex projects: the right system, practical knowledge and support that stays with the job.

“Customer testimonials to reinforce our partnerships, relationships and vibes”.

Dean Martin, Company Name

Want to get in touch and discuss your options? Contact us today

Product updates, insights and practical know-how straight to your inbox.

By signing up, you agree to our privacy policy.

Product updates, insights and practical know-how straight to your inbox.

By signing up, you agree to our privacy policy.